Learn
Task Guide: Designing an Urban Electric Tramway Proposal Deck
Alpha status (14 October 2026): XiSlides is planned and its public installer is not verified. This page describes the checked DeckCraft foundation; XiKey integration is still in progress. Alpha is free today.
Scenario Overview
In this guide, you will design a 24-slide municipal transport briefing deck proposing a zero-emission Light-Rail & Electric Tramway Corridor. You will build a custom Slide Master with consistent civic branding, construct a station-interchange schematic using editable shapes and connectors and routed vector connectors, animate a phased rolling-stock timeline using Morph transitions, and sequence callouts in the Animation Pane.
Step 1: Configure Widescreen Geometry and Slide Master Layouts
- Create a new presentation (
Ctrl+N) and open Design › Slide Size to verify 16:9 Widescreen. - Switch to View › Slide Master:
- On the root Master slide, define the theme color palette (
Deep Slate #182634,Tram Emerald #1E8A5E,Signal Amber #E08E26,Warm Alabaster #F7F6F2) and set the heading/body font pair. - Add a persistent vector corridor line along the bottom footer with a Slide Number field and manually maintained section label.
- Customize two child layouts: Corridor Map + KPI Sidebar and Before / After Street Cross-Section.
- On the root Master slide, define the theme color palette (
- Exit Master View to return to Normal View, and organize the deck into four collapsible sections in the Thumbnail Rail (1. Corridor Vision, 2. Station Architecture, 3. Rolling Stock & Headways, 4. Capital Phasing).
Step 2: Build the Multimodal Hub Diagram with Shapes and Connectors
- Add a slide using the Corridor Map + KPI Sidebar layout and press
Shift+F9to show Gridlines andAlt+F9to enable Smart Guides. - Draw four labelled shapes and connect them to show construction stages: Utility Relocation → Track Slab Pour → Charging Pads → Signal Commissioning. Imported SmartArt is not a full editable diagram model.
- Below the phasing bar, draw three rounded station nodes (
Regional Rail Concourse,Low-Floor Tram Platform,Protected Cycle Hub) and link them using Insert › Connectors › Elbow Arrow Connector. Because connectors snap to shape connection points, nudging any station node (Arrowkeys for6 ptorAlt+Arrowfor1 pt) automatically re-routes the connecting arrows.
Step 3: Animate Street Cross-Sections with the Morph Transition
- On Slide 11 (
Current 6-Lane Arterial), draw the cross-section components as named vector shapes:Left Sidewalk,Traffic Lanes West,Center Median,Traffic Lanes East, andRight Sidewalk. - Duplicate Slide 11 (
Ctrl+D) to create Slide 12 (Proposed Green Tram Boulevard). - On Slide 12, resize
Center Medianinto a wide grass-track tramway bed, narrow the outer car lanes, and expand the cycle tracks and tree canopy shapes. - With Slide 12 selected, go to Transitions › Morph and set Duration to
1.20 s. During playback, XiSlides smoothly interpolates the position, width, color, and opacity of matching shapes; preview the result between Slide 11 and Slide 12.
Step 4: Sequence KPI Callouts in the Animation Pane
- On Slide 15 (
Peak-Hour Ridership Forecast), select the three callout cards (4,200 pax/hr/dir,90-second signal priority,-38% corridor noise). - Open Animations › Wipe (From Bottom) and open the Animation Pane:
- Set Card 1 to On Click (
Duration: 0.35 s). - Set Cards 2 and 3 to After Previous with a
0.15 sdelay so all three metrics cascade cleanly on a single click.
- Set Card 1 to On Click (